|
|
| Pillar Footing Top Mold parts (more corner gaurds come with the casting though). The storage box thing there comes out hollowish. |
|
|
|
| Pillar footing assembly, the bottom will need to be sanded down. | ||
| Add some stock scaffolding and the effect is completed. | he Railway Doors sheet, ready for casitng. |
|
|
|
| Some (sanded) Tiberium Gateway Sheet castings. | Tiberium Gateway Sheet needs more metal powder then its ready to cast. | Diamond Kick Plate sheet, w/some castings. |
| Part 19 | Home | |
| Mech Bay Gribbly [Master] Sheets, the PFTop sheet masters are shown prior to molding here | Up |