GGRU Part 20

June 5th, 2007

Various GGRU Sheets for the Mech Bay project

The 2 sides of the casting that is the Bottom segement of the pillar footing gribbly. The castings that come with the Pillar footing base mold. Main body of the Mole, aka hot water heater, some replacement toner 
         cartirage packaging bits, and supper glue caps.
The 2 sides of the casting that is the Bottom segement of the pillar footing gribbly. Other things in the PF Bottom mold Main: Body of the Mole, aka hot water heater, some replacement toner cartirage packaging bits, and supper glue caps.
Pillar Footing Top Mold castings (more corner gaurds come with the casting 
         though). A Storage box piece (comes out hollow) and missile packs.
Pillar Footing Top Mold parts (more corner gaurds come with the casting though).  The storage box thing there comes out hollowish.
Pillar footing assembly, the bottom will need to be sanded down. The Pillar footting with a piece of scaffolding added. The Railway Doors sheet, ready for casitng.
Pillar footing assembly, the bottom will need to be sanded down.
Add some stock scaffolding and the effect is completed. he Railway Doors sheet, ready for casitng.
Some sanded Tiberium Gateway Sheet castings. The Tiberium Gateway Sheet partially powderized. Diamond Kick Plate sheet.
Some (sanded) Tiberium Gateway Sheet castings. Tiberium Gateway Sheet needs more metal powder then its ready to cast. Diamond Kick Plate sheet, w/some castings.