J-57 Jefferies Space Station Refit, Part 6

Novemeber 5th, 2006

Assembly of the Station for a Test Powering

Joe attaches the wiring. Yikes Joe got a shock off the EL wire circuit. Neck Lights are online, inclding the pulsing ones in the joint.
Yikes Joe got a shock off the EL wire circuit!  Sparky says, "If you don't get a shock, it don't count do it again."
Joe attaches the wiring complacated wiring. Neck lights are online, inclding the pulsing ones in the joint.
Joe's balancing the driver board. Fitting da docks. The station's taking shape.
Joe's balancing the driver board. Fitting da docks. The station's taking shape.
The Threw-deck and the Orin lodged in there docks. The NCC-1104 threw-deck and Orin await their turn. The USPS is still goin' strong.
The NCC-1104 Threw-Deck carrier and Orin await their turn. The Yard Dogs await docking to the ends of the spines.