J-57 Refit for Butch-O'Hare Part 3

October 7th, 2006

A review of the ships and docks

The Orin awaits it's docking claws. Several of the remounted ships & claws. The other re-assembled docks.
The Orin awaits it's docking claws. Review of the remounted ships & claws.
This dock's ship required repair, it had only been friction fitted and fell off while I tested the power. It was the threw-deck, the saucer popped off the neck, Tony's pined it back in place.
This dock's ship required repair, it had only been friction fitted and fell off while I was testing the power. It was the threw-deck, the saucer popped off the neck, Tony's pined it back in place.