J-57 Refit for Butch-O'Hare Part 2

October 7th, 2006

Tony Came by with a wakeup call at 11:30

The tug was repaired, you can see the crack between the secondary hull and the neck though. Tony's reworked the tug's engine canister. A shot if the re-attached hatch.
The tail end of the tug, nicknamed the Mr. Hanky canister.
The tug was repaired, you can see the crack between the secondary hull and the neck though. Tony's reworked the tug's engine canister, he also repaired the Mr. Hanky canister, which resides at the tail end of the tug. A shot if the re-attached hatch.
A Brass rod has been added to the hollow aluminum one for reinforcement. A system monitor's nacelle was nocked off last time Tony repaired it today.
A Brass rod has been added to the hollow aluminum one for reinforcement. A system monitor's nacelle was nocked off last time Tony repaired today.
Zog's ETV-7 got new gold pin spires. The other nacell also got a new gold pin spire to match.
Zog's ETV-7 got new gold pin spires.